tempaLive demo · simulated estate
Sign in
Backup power assets
2
UPS, Generator
Protected circuits
1
2 cold assets on backup power
Unprotected cold assets
0
depend on mains alone
Tests overdue
1
Standby generator past the test interval

Resilience register

Backup power assets, live state, battery health, last test and result, and when the next test is due.

AssetLive stateRatedBattery healthLast testNext dueInterval
Dispensary UPS
UPS
mains present · 1 h 0 min runtime left1.5 kW88 %14 Oct 2026 · passed12 Jan 202790 days
Standby generator
Generator
mains present8 kW—14 Sept 2026 · partial passOverdue · was due 14 Oct 2026, 20 d ago30 days

Protected circuits

Circuit → backup asset → the cold assets it keeps running, with live state.

  • Vaccine fridge circuit (UPS)→ Dispensary UPSno telemetry
    Treatment room and dispensary vaccine fridges, fed from the dispensary UPS

Unprotected cold assets

Every cold asset at Hillside GP Surgery is on a protected circuit.

Tests log

Generator runs, UPS self-tests and drills, with the measurements recorded.

WhenAssetTestResultNotes
14 Oct, 20:40Dispensary UPSUPS self testpassedScheduled self-test (simulated record)
Load 22 % · Runtime achieved 1 h 2 min
14 Sept, 20:40Standby generatorGenerator testpartial passStarted on the second attempt; fuel filter replaced afterwards (simulated record)
Ran 20 min · Transfer 14 s

Simulated data from the Tempa demo estate. Read-only. Sensor payloads are generated by the virtual fleet and ingested through the same webhook path as real devices.